St Mary’s Hospital – NHS
Refurbishing listed gatehouse
Transforming Healthcare Environments
Client: Leeds and York Partnership NHS Foundation Trust
The listed entrance gatehouse at St Mary’s Hospital had become neglected. NHS consultants tendered a refurbishment scheme, and, with our successful proposal, we were awarded the 12-week contract.
Following site mobilisation and erection of security hoarding, we stripped out the services and internal walls. A new damp proof system was installed and renovating plaster applied to external walls. Internally, we formed offices, comms room, WCs, and beverage areas for a new security facility. Externally, we rendered, cleaned, and re-pointed the elevations and installed new UPVC sliding sash windows and security steel doors.
The building was rewired throughout, and a new flooring and decoration scheme completed the project.
Value: £150k | Duration: 12 weeks
View project image gallery below…
Request a Callback
![](https://www.tomlinson.construction/wp-content/uploads/2022/06/unilever-g.png)
![](https://www.tomlinson.construction/wp-content/uploads/2022/06/ambulance.png)
![](https://www.tomlinson.construction/wp-content/uploads/2022/06/sonoco-alcore.png)
![](https://www.tomlinson.construction/wp-content/uploads/2022/06/stephenson.png)
![](https://www.tomlinson.construction/wp-content/uploads/2022/06/dales.png)
![](https://www.tomlinson.construction/wp-content/uploads/2022/06/waterton.png)
![](https://www.tomlinson.construction/wp-content/uploads/2022/06/coe.png)
![](https://www.tomlinson.construction/wp-content/uploads/2022/06/ageuk.png)
![](https://www.tomlinson.construction/wp-content/uploads/2022/06/iwm.png)
![](https://www.tomlinson.construction/wp-content/uploads/2022/06/britvic-g.png)
![](https://www.tomlinson.construction/wp-content/uploads/2022/06/carlsberg-g.png)
![](https://www.tomlinson.construction/wp-content/uploads/2022/06/lcc-g.png)
![](https://www.tomlinson.construction/wp-content/uploads/2022/06/next.png)
![](https://www.tomlinson.construction/wp-content/uploads/2022/06/wyp-g.png)
![](https://www.tomlinson.construction/wp-content/uploads/2022/06/yw-g.png)
![](https://www.tomlinson.construction/wp-content/uploads/2022/06/think-g.png)
![](https://www.tomlinson.construction/wp-content/uploads/2022/06/bradford-nhs.png)
![](https://www.tomlinson.construction/wp-content/uploads/2022/06/pathfinder.png)
![](https://www.tomlinson.construction/wp-content/uploads/2022/06/pinsent-masons.png)
![](https://www.tomlinson.construction/wp-content/uploads/2022/06/rotherham.png)
![](https://www.tomlinson.construction/wp-content/uploads/2022/06/salts.png)
![](https://www.tomlinson.construction/wp-content/uploads/2022/06/speedibake.png)
![](https://www.tomlinson.construction/wp-content/uploads/2022/06/yas.png)
![](https://www.tomlinson.construction/wp-content/uploads/2022/06/york-st-john.png)
![](https://www.tomlinson.construction/wp-content/uploads/2022/06/dzign.png)
![](https://www.tomlinson.construction/wp-content/uploads/2022/06/afc-g.png)